Illinois State Library

Electronic Documents of Illinois


Search:
F* in FirstWord [X]
Illinois Department of Transportation in Organization [X]
rss icon RSS
Results:  40 Items
Sorted by:  
Page: 1 2  Next
Organization
Illinois Department of Transportation[X]
XMLRecordID
000000017852 (1)
000000018330 (1)
000000021103 (1)
000000021602 (1)
000000027439 (1)
DateCreated
 

Title:  

Fabrication of Highway Signs Policy, Effective February 1, 2016

 
 Volume/Number:    
 Issuing Agency:   
 Description:  Roadway signs are the major traffic control device the department uses along its roadways to communicate to motorists. In order to provide this important information, and as a result of the improvements and cost reductions of prismatic retroreflective sign sheeting materials, the Central Bureau of Operations has updated the departments retroreflective sign sheeting policy. 
 Date Created:  02-09-2016 
 Agency ID:   
 ISL ID:  000000057171   Original UID: 178243 FIRST WORD: Fabrication 
 

Title:  

Fabrication of Highway Signs Policy: Effective January 1, 2016

 
 Volume/Number:    
 Issuing Agency:   
 Description:  Roadway signs are the major traffic control device the department uses along its roadways to communicate to motorists. In order to provide this important information, and as a result of the improvements and cost reductions of prismatic retroreflective sign sheeting materials, the Central Bureau of Operations has updated the departments retroreflective sign sheeting policy. 
 Date Created:  12-15-2015 
 Agency ID:   
 ISL ID:  000000057063   Original UID: 178095 FIRST WORD: Fabrication 
 

Title:  

Fairmont City / E. St. Louis

 
 Volume/Number:  2012 September 17 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that on Sunday, September 23rd from 6:00 AM until 7:00 PM, First Street will be reduced to one lane traffic between Exchange Avenue and St. Clair Avenue (IL 3) in Fairmont City / East St. Louis, weather permitting. Two-way traffic will be maintained using flaggers. 
 Date Created:  09 17 2012 
 Agency ID:   
 ISL ID:  000000045276   Original UID: 24637 FIRST WORD: Fairmont 
 

Title:  

Fake IDOT messages part of ongoing phishing scam targeting public

 
 Volume/Number:  2021 June 22 
 Issuing Agency:   
 Description:  Press Release: Fake IDOT messages part of ongoing phishing scam targeting public. 
 Date Created:  06-22-2021 
 Agency ID:   
 ISL ID:  000000092026   Original UID: 202495 FIRST WORD: Fake 
 

Title:  

Fall driving can get risky when deer get frisky

 
 Volume/Number:  2019 October 10 
 Issuing Agency:   
 Description:  Press Release: With the onset of autumn, the school year is in full swing, pumpkin lattes aresteaming and Illinois deer are feeling amorous. 
 Date Created:  10-10-2019 
 Agency ID:   
 ISL ID:  000000087447   Original UID: 198432 FIRST WORD: Fall 
 

Title:  

Fans Dont Let Fans Drive Drunk

 
 Volume/Number:  2018 February 1 
 Issuing Agency:   
 Description:  Press Release: As Americas football fans gear up for one of the most anticipated sporting events of the year, the Illinois Department of Transportation and Illinois State Police are taking a timeout to spread an important safety message: Fans dont let fans drive drunk. 
 Date Created:  02-01-2018 
 Agency ID:   
 ISL ID:  000000081659   Original UID: 194223 FIRST WORD: Fans 
 

Title:  

Fastener Identification Guide

 
 Volume/Number:  2008 October 
 Issuing Agency:   
 Description:  This guide provides information and drawings intended to help IDOT personnel and others involved in transportation projects identify fasteners meeting code and specification requirements. 
 Date Created:  05 13 2008 
 Agency ID:   
 ISL ID:  000000021602   Original UID: 10891 FIRST WORD: Fastener 
 

Title:  

Faster, cheaper, safer: I-255 work wraps up this weekend

 
 Volume/Number:  2020 October 30 
 Issuing Agency:   
 Description:  Press Release: Rehabilitation completed ahead of schedule, reopens to traffic Saturday. 
 Date Created:  10-30-2020 
 Agency ID:   
 ISL ID:  000000089283   Original UID: 200342 FIRST WORD: Faster, 
 

Title:  

Fayette Avenue at the I-57/70 interchange in Effingham

 
 Volume/Number:  2011 March 10 
 Issuing Agency:   
 Description:  In the next week, weather permitting, traffic on the Fayette Avenue interchange will be altered dramatically. 
 Date Created:  03 10 2011 
 Agency ID:   
 ISL ID:  000000035022   Original UID: 16455 FIRST WORD: Fayette 
 

Title:  

Fayette Avenue interchange at Interstates 57/70 in Effingham

 
 Volume/Number:  2010 November 5 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation has announced that construction work will begin on the reconstruction of the Fayette Avenue interchange on November 15, 2010. Preliminary layout work for traffic control will begin on Monday November 8, 2010. 
 Date Created:  11 05 2010 
 Agency ID:   
 ISL ID:  000000030249   Original UID: 14156 FIRST WORD: Fayette 
 

Title:  

Federal Alcohol and Drug Testing Requirements: Information for Motor Carriers

 
 Volume/Number:  2010 May 
 Issuing Agency:   
 Description:  Brochure describing federal alcohol and drug testing requirements, information for motor carriers. 
 Date Created:  05 17 2010 
 Agency ID:   
 ISL ID:  000000038117   Original UID: 18925 FIRST WORD: Federal 
 

Title:  

Federal Highway Administration Highway Safety Improvement Program: Five Percent Report

 
 Volume/Number:  2009 September 
 Issuing Agency:   
 Description:  As part of the Highway Safety Improvement Program (HSIP), states are required to submit an annual report to the Federal Highway Administration (FHWA) describing at least five percent of highway locations exhibiting the most pressing safety needs. This Five Percent Report will help Illinois is to gain an understanding of the nature and extent of safety problems, to provide guidance on where safety investments are needed, and to provide a basis for tracking the progress toward improving safety in the state. 
 Date Created:  12 03 2009 
 Agency ID:   
 ISL ID:  000000049723   Original UID: 170919 FIRST WORD: Federal 
 

Title:  

Federal Highway Administration Highway Safety Improvement Program: Five Percent Report

 
 Volume/Number:    
 Issuing Agency:   
 Description:  As part of the Highway Safety Improvement Program (HSIP), states are required to submit an annual report to the Federal Highway Administration (FHWA) describing at least five percent of highway locations exhibiting the most pressing safety needs. This Five Percent Report will help Illinois is to gain an understanding of the nature and extent of safety problems, to provide guidance on where safety investments are needed, and to provide a basis for tracking the progress toward improving safety in the state. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000049896   Original UID: FIRST WORD: Federal 
 

Title:  

Fifth Avenue Bridge Replacement in Melrose Park

 
 Volume/Number:  2012 April 11 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced that a project to remove and replace the Fifth Avenue bridge over Silver Creek in Melrose Park is scheduled to begin, weather permitting, on Monday, April 16. 
 Date Created:  04 11 2012 
 Agency ID:   
 ISL ID:  000000042736   Original UID: 22261 FIRST WORD: Fifth 
 

Title:  

Final Environmental Report Recommends Illiana Corridor Development

 
 Volume/Number:  2014 Septenber 26 
 Issuing Agency:   
 Description:  The Federal Highway Administration (FHWA) today published the Illiana Corridor Tier Two Final Environmental Impact Statement (EIS), which recommends a new 50-mile toll road that will connect Interstate 55 near Wilmington, Ill., with Interstate 65 near Lowell, Ind. The reports recommendation comes after nearly four years of the Illinois Department of Transportation (IDOT) and the Indiana Department of Transportation (INDOT) working comprehensively with all impacted parties throughout the region. 
 Date Created:  09-26-2014 
 Agency ID:  1140**14 
 ISL ID:  000000052756   Original UID: 173976 FIRST WORD: Final 
 

Title:  

Final ramp schedule for I-57/I-74

 
 Volume/Number:  2011 July 13 
 Issuing Agency:   
 Description:  July 18 through July 21 the eastbound I-74 to southbound I-57 (ramp CA) July 21 and 22 the westbound I-74 to northbound I-57 (ramp DB) July 25 through July 27 the northbound I-57 to westbound I-74 (ramp AC) July 27 and July 28 the southbound I-57 to eastbound I-74 (ramp BD) July 28 - 8 PM to July 29 7 AM the westbound I-74 to southbound I-57 (ramp DA) This ramp is being done at night due to the high volume of traffic during daylight hours. Southbound I-57 will be reduced to one lane of traffic during this time period also. 
 Date Created:  07 13 2011 
 Agency ID:   
 ISL ID:  000000036706   Original UID: 17867 FIRST WORD: Final 
 

Title:  

Final week to vote for IDOT project as best in nation

 
 Volume/Number:  2018 September 18 
 Issuing Agency:   
 Description:  Press Release: Less than one week remains to vote for the Illinois Department of Transportation's Interstate 55-Lake Shore Drive interchange reconstruction as the country's top transportation project. If the project wins, IDOT will donate the $10,000 in prize money for a local nonprofit to the Special Olympics. 
 Date Created:  09-18-2018 
 Agency ID:   
 ISL ID:  000000082736   Original UID: 195434 FIRST WORD: Final 
 

Title:  

First of Jane Byrne Interchange Bridges Opens

 
 Volume/Number:  2014 October 6 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announced tonight that the new Morgan Street bridge is now open to traffic. Morgan Street is the first of the nine major bridges crossing the expressway system near downtown Chicago that are being rebuilt as part of Governor Pat Quinns $420 million reconstruction of the Jane Byrne Interchange. 
 Date Created:  10-06-2014 
 Agency ID:  1186**14 
 ISL ID:  000000054341   Original UID: 175697 FIRST WORD: First 
 

Title:  

First Street (US 67) in Milan closed at I-280 overpass

 
 Volume/Number:  2012  
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that First Street (US 67) in Milan will be closed at the I-280 overpass on Tuesday night, April 24, 2012. The roadway will be closed from 6:00 p.m. Tuesday evening until 6:00 a.m. Wednesday morning to allow for the removal of the westbound I-280 bridge over First Street (US 67). 
 Date Created:  04 20 2012 
 Agency ID:  April 20 
 ISL ID:  000000042776   Original UID: 22306 FIRST WORD: First 
 

Title:  

Fiscal 2021 In Review Annual Report

 
 Volume/Number:    
 Issuing Agency:   
 Description:  On behalf of the Illinois Department of Public Health (IDPH), it is my sincere pleasure to present the 2021 Annual Report. Public health has been propelled into the forefront as a result of a worldwide pandemic. 
 Date Created:  12-27-2021 
 Agency ID:   
 ISL ID:  000000093653   Original UID: 203975 FIRST WORD: Fiscal 
Page: 1 2  Next